Trainorama 4712
- Length: 0:13
- Rating Average: n/a
- View Count: 158
- Author: JohannE29
Trainorama locos 4712 and 44100
Arriving at Linhurst
- Length: 0:50
- Rating Average: n/a
- View Count: 87
- Author: JohannE29
Tags: model Railway Trains wagons track railroad locomotive trucks
Train arriving at Linhurst
Bridge Crossing
- Length: 0:31
- Rating Average: n/a
- View Count: 46
- Author: JohannE29
Tags: model Railway Trains wagons track railroad locomotive trucks
Train crosses the bridge on the branch line
First Train on Extension
- Length: 1:27
- Rating Average: n/a
- View Count: 246
- Author: JohannE29
This single track loop has taken 1 year from concept to reality, at a cost of $4500. The new part of the layout required a extention to the exsisting train room.
First Train on the Branch
- Length: 1:19
- Rating Average: 5.0' max='5' min='1' numRaters='1' rel='http://schemas.google.com/g/2005#overall from people
- View Count: 179
- Author: JohannE29
Tags: model Railway Trains wagons track railroad locomotive trucks
The track for the branch line is now laid and wired. Green 4836 with a Hollywood mech tows 3 TrainOrama steel S trucks and 3 Austrains MLE wagons. Starts adjacent to the Carcoar Stock Siding, travels trough Carcoar passed the goods siding and across the bridge (bridge un-named as yet) and into...
Page: 1 of 3











